Construction Timeline

Jul 20, 2021
Construction of a ground floor prefabricated house of 65.60 sq.m. in Pauliani, Fthiotida. eco-label
Jul 16, 2021
Construction of a ground floor prefabricated house 90.89 sq.m. in Rafina. eco-label
Jul 07, 2021
Construction of a ground floor prefabricated house of 118.40 sq.m. in Logos. eco-label
Jun 28, 2021
Construction of a ground floor prefabricated house of 65.60 sq.m. in Mytilini. eco-label
Jun 21, 2021
Construction of a two-story prefabricated house 95.00 sq.m. in Oreus-North Evia. eco-label
Jun 10, 2021
Construction of 2 ground-floor Flexyhome houses with a total area of 100.80 sq.m. at Chania. eco-label
Jun 01, 2021
Construction of a ground floor Flexyhome house 61.40 sq.m. in Tripoli. eco-label
May 27, 2021
Construction parts of a two-story prefabricated house were delivered to our commercial partner Zentili Michalis with an area of 140.10 m2 for construction in Zakaki Limassol, Cyprus. eco-label
May 14, 2021
Construction of a TOURIST COMPLEX (HOTEL UNIT) with a total area of 400.00 sq.m. in KO. eco-label
May 05, 2021
Construction of a ground floor Flexyhome house 114.00 sq.m. in Nafplio. eco-label
Apr 29, 2021
Construction parts of the ground floor with attic of a prefabricated house were delivered to our commercial partner Zentili Michalis with an area of 147.2 m2 for construction in Agia Varvara, Cyprus. eco-label
Apr 14, 2021
Construction of TOURIST ACCOMMODATIONS with a total area of 234.15 sq.m. to the Gargalians of Messinia. eco-label