Construction Timeline

Nov 04, 2020
Construction of a flexyhome ground floor residence with a total area of 81.16 sq.m. for the 120 PEA (MILITARY AVIATION) AIRPORT of Kalamata. eco-label
Oct 28, 2020
Construction of a ground floor prefabricated house 186.30 sq.m. in Lemnos. eco-label
Oct 22, 2020
Construction of a ground floor prefabricated house of 73.15 sq.m. in Samos. eco-label
Oct 14, 2020
Construction of 2 ground-floor flexyhomes with a total area of 51.40 sq.m. in Bokoliana Ilias. eco-label
Oct 08, 2020
Construction of a two-storey prefabricated house of 242.88 m2 in Chalkida. eco-label
Oct 02, 2020
Construction parts of a two-storey prefabricated house were delivered to our commercial partner Zentili Michalis with an area of 200.00 m2 for construction in Larnaca Cyprus eco-label
Sep 29, 2020
Construction of a two-story prefabricated house of 134.54 m2 in New Philadelphia. eco-label
Sep 25, 2020
Construction of a tourist complex of 2 ground-floor Flexyhome houses with a total area of 81.10 sq.m. in Kefalonia. eco-label
Sep 14, 2020
Construction of a two-story prefabricated house of 116.80 m2 in Moschato. eco-label
Sep 03, 2020
Construction of a ground floor house with a flexyhome attic with a total area of 101.87 sq.m. in Porto Rafti. eco-label
Aug 10, 2020
Construction of a ground floor prefabricated house 100.38 sq.m. in Vonitsa. eco-label
Aug 03, 2020
Construction of a two-storey prefabricated house of 145.25 m2 in Vrilissia. eco-label