Construction Timeline

Jan 08, 2020
Construction of a ground floor prefabricated house 85.75 sq.m. in Chalkida. eco-label
Dec 23, 2019
Construction of a ground floor prefabricated house of 114.53 sq.m. in Artemisa, Attica. eco-label
Dec 16, 2019
Construction of a flexyhome ground floor residence with a total area of 81.16 sq.m. in Ag. Andriano of Nafplio. eco-label
Dec 06, 2019
Construction parts of a ground floor prefabricated house were delivered to our commercial partner Zentili Michalis with an area of 120.00 m2 for construction in Cyprus eco-label
Dec 03, 2019
Construction of a two-story prefabricated house of 129.74 sq.m. in the Pikermio Draft. eco-label
Nov 25, 2019
Construction of a two-story prefabricated house of 129.95 sq.m. in Kalyvia Attica. eco-label
November 19, 2019
Construction of a ground floor prefabricated house of 131.39 sq.m. in Agios Andrianos, Nafplion. eco-label
November 11, 2019
Construction of a ground floor prefabricated house of 90 sq.m. in Kefalonia. eco-label
Oct 31, 2019
Construction of a two-story prefabricated house 179.23 sq.m. in Moschato. eco-label
Oct 15, 2019
Construction of two ground-floor flexyhome houses, one with a total area of 61.44 sq.m. and the other 81,168 sq.m. in Gerakas Attica. eco-label
Oct 03, 2019
Construction of a ground floor prefabricated house of 83.64 sq.m. in Magoula! eco-label
Sep 20, 2019
Construction of a ground floor house with a total area of 61.43 sq.m. in Artemis Attica! eco-label