Construction Timeline
Jul 20, 2021
Construction of a ground floor prefabricated house of 65.60 sq.m. in Pavliani, Fthiotida.
Jul 16, 2021
Construction of a ground floor prefabricated house of 90.89 sq m in Rafina.
Jul 07, 2021
Construction of a ground floor prefabricated house of 118.40 sq.m. in Longos.
Jun 28, 2021
Construction of a ground floor prefabricated house of 65.60 sq.m. in Mytilene.
Jun 21, 2021
Construction of a two-story prefabricated house of 95.00 sq.m. in Oreoi-North Evia.
Jun 10, 2021
Construction of 2 ground floor Flexyhome houses with a total area of 100.80 sq m in Chania.
Jun 01, 2021
Construction of a ground floor Flexyhome house of 61.40 sq m in Tripoli.
May 27, 2021
Construction parts of a two-story prefabricated house were delivered to our commercial partner Zintilis Michalis, measuring 140.10 sq m, for construction in Zakaki, Limassol, Cyprus.
May 14, 2021
Construction of a TOURIST COMPLEX (HOTEL UNIT) with a total area of 400.00 sq.m. in Kos.
May 05, 2021
Construction of a ground floor Flexyhome house of 114.00 sq.m. in Nafplio.
Apr 29, 2021
Construction sections of a ground floor with attic of a prefabricated house were delivered to our commercial partner Zintilis Michalis, measuring 147.2 sq m, for construction in Agia Varvara, Cyprus.
Apr 14, 2021
Construction of TOURIST ACCOMMODATIONS with a total area of 234.15 sq m in Gargaliani, Messinia.
