Construction Timeline
Sep 09, 2021
Construction parts of a ground floor prefabricated house were delivered to our commercial partner Zintilis Michalis, measuring 130.30 sq m, for construction in Akrotiri, Limassol, Cyprus.
Sep 08, 2021
Construction of a ground floor Flexyhome house of 81.16 sq m in Akrata.
Sep 01, 2021
Construction of a two-story prefabricated house (Stage 1) with a total area of 215.00 sq m in Artemida, Attica.
Aug 10, 2021
Construction parts of a two-story prefabricated house were delivered to our commercial partner Zintilis Michalis, measuring 243.70 sq m, for construction in Larnaca, Cyprus.
Jul 28, 2021
Construction of a two-story prefabricated house of 146.57 sq m in Ippokrateio Politia.
Jul 20, 2021
Construction of a ground floor prefabricated house of 65.60 sq.m. in Pavliani, Fthiotida.
Jul 16, 2021
Construction of a ground floor prefabricated house of 90.89 sq m in Rafina.
Jul 07, 2021
Construction of a ground floor prefabricated house of 118.40 sq.m. in Longos.
Jun 28, 2021
Construction of a ground floor prefabricated house of 65.60 sq.m. in Mytilene.
Jun 21, 2021
Construction of a two-story prefabricated house of 95.00 sq.m. in Oreoi-North Evia.
Jun 10, 2021
Construction of 2 ground floor Flexyhome houses with a total area of 100.80 sq m in Chania.
Jun 01, 2021
Construction of a ground floor Flexyhome house of 61.40 sq m in Tripoli.
