Construction Timeline
Sep 09, 2021
Construction parts of a ground floor prefabricated house were delivered to our commercial partner Zentili Michalis with an area of 130.30 m2 for construction in Akrotiri Limassol, Cyprus.
Sep 08, 2021
Construction of a ground floor Flexyhome house 81.16 sq.m. in Akrata.
Sep 01, 2021
Construction of a two-storey prefabricated house (Stage 1) with a total area of 215.00 sq.m. in Artemisa Attica.
Aug 10, 2021
Construction parts of a two-story prefabricated house were delivered to our commercial partner Zentili Michalis with an area of 243.70 m2 for construction in Larnaca, Cyprus.
Jul 28, 2021
Construction of a two-story prefabricated house 146.57 sq.m. in the Hippocratic State.
Jul 20, 2021
Construction of a ground floor prefabricated house of 65.60 sq.m. in Pauliani, Fthiotida.
Jul 16, 2021
Construction of a ground floor prefabricated house 90.89 sq.m. in Rafina.
Jul 07, 2021
Construction of a ground floor prefabricated house of 118.40 sq.m. in Logos.
Jun 28, 2021
Construction of a ground floor prefabricated house of 65.60 sq.m. in Mytilini.
Jun 21, 2021
Construction of a two-story prefabricated house 95.00 sq.m. in Oreus-North Evia.
Jun 10, 2021
Construction of 2 ground-floor Flexyhome houses with a total area of 100.80 sq.m. at Chania.
Jun 01, 2021
Construction of a ground floor Flexyhome house 61.40 sq.m. in Tripoli.