Construction Timeline
June 20, 2016
Construction of a ground-floor wooden Finnish house with an attic (with single masonry technology) with a total area of 101 sq.m. in Kalavryta, Achaia
June 14, 2016
The sale of Container construction in Santorini has been completed
June 13, 2016
Construction of a ground-floor flexyhome house with a total area of 53 sq.m in Lavrio
Jun 02, 2016
Construction of a ground floor house with a total area of 57 sq.m. in Artemis
May 30, 2016
A ground floor house of stage 1 (unfinished) was handed over to our commercial partner Zentili Michalis with an area of 168 sq.m. for construction in Limassol, Cyprus.
May 25, 2016
The sale of Container BOX construction in Spata has been completed
May 17, 2016
Construction of a two-storey house with an attic of a total area of 198 sq.m. in Korydallos, Attica
May 09, 2016
Construction of a ground-floor wooden Finnish house (with double masonry technology) with a total area of 83 sq.m. in Kapandriti, Attica
April 15, 2016
Construction of a ground floor house flexyhome in Alimos Attica
April 11, 2016
Construction of a ground-floor wooden Finnish house (with double masonry technology) with a total area of 104 sq.m. in Lutsaina of Lobster
Apr 04, 2016
Construction of a ground-floor flexyhome house with a total area of 49 sq.m in Kastos, Lefkada
Mar 21, 2016
Construction of a ground-floor flexyhome house with a total area of 61 sq.m in Preveza
