Construction Timeline
Jun 20, 2016
Construction of a ground-floor wooden Finnish house with an attic (using single-wall construction technology) with a total area of 101 sq.m. in Kalavryta, Achaia
Jun 14, 2016
The sale of the Container construction in Santorini has been completed
Jun 13, 2016
Construction of a ground floor flexyhome residence with a total area of 53 sq.m in Lavrio
Jun 02, 2016
Construction of a ground floor residence with a total area of 57 sq m in Artemida
May 30, 2016
A ground floor residence of stage 1 (unfinished) was delivered to our commercial partner Zintilis Michalis, with an area of 168 sq m. for construction in Limassol, Cyprus.
May 25, 2016
The sale of the Container BOX construction in Spata has been completed
May 17, 2016
Construction of a two-story house with an attic of a total area of 198 sq m in Korydallos, Attica
May 09, 2016
Construction of a ground-floor wooden Finnish house (with double-wall technology) with a total area of 83 sq.m. in Kapandriti, Attica
Apr 15, 2016
Construction of a ground floor flexyhome residence in Alimos, Attica
Apr 11, 2016
Construction of a ground-floor wooden Finnish house (with double-wall technology) with a total area of 104 sq m in Loutsina, Astakos
Apr 04, 2016
Construction of a ground floor flexyhome residence with a total area of 49 sq.m. in Kastos, Lefkada
Mar 21, 2016
Construction of a ground floor flexyhome residence with a total area of 61 sq.m. in Preveza
