Construction Timeline

Sep 16, 2019
Construction of a two-story wooden Finnish house with a total area of 135.60 sq.m. in Skepasto Kalavryta
Sep 05, 2019
Construction of a ground floor prefabricated house with an attic of 114.92 m2 in Vrachni Kalavryton. eco-label
August 30, 2019
Construction of a wooden Finnish house with a total area of 102.60 sq.m. in Kalliphytos of Drama
Aug 02, 2019
Construction parts of a ground floor prefabricated house were delivered to our commercial partner Zentili Michalis with an area of 206.80 m2 for construction in Larnaca, Cyprus. eco-label
Aug 01, 2019
Small complex of rental houses 3 x 31.70 sq.m. in Artemis Attica! eco-label
July 22, 2019
Construction of a two-storey prefabricated house of 134.93 m2 in Kastelokampos, Patras. eco-label
July 16, 2019
Construction of a ground floor house with a total area of 70.22 sq.m. in Ikaria! eco-label
Jul 05, 2019
Construction parts of a two-story prefabricated house were delivered to our commercial partner Zentili Michalis with an area of 141.70 m2 for construction in Larnaca, Cyprus. eco-label
Jul 01, 2019
Construction of a ground floor house with a total area of 81.00 sq.m. at Erythres Mandras! eco-label
June 19, 2019
Construction of a ground floor house with a total area of 103.02 sq.m. in Artemis Attica! eco-label
Jun 11, 2019
Construction of a ground floor house with a total area of 44.50 sq.m. in Lemnos! eco-label
May 30, 2019
Construction of a ground floor house with a total area of 53.70 sq.m. in Soullaroi Kefalonia! eco-label