Construction Timeline
Aug 26, 2024
Construction of a ground floor Prefab house 65.60 sq.m. in Corfu.
July 15, 2024
Construction of a ground floor Prefab house 106.59 sq.m. in Messinia.
July 11, 2024
Construction of the ground floor with an attic of a prefabricated house of 135.00 sq.m. in Tripoli.
June 19, 2024
Construction of a ground floor FlexyHome house 60.25 sq.m. in Inofyta.
June 11, 2024
Construction of a three-storey prefabricated house 160.52 sq.m. to Gerakas.
Jun 06, 2024
Construction parts of a ground floor prefabricated house were delivered to our commercial partner Zentili Michalis with an area of 76.15 m2 for construction in Limassol, Cyprus.
Jun 04, 2024
Construction of ground floor with attic of a prefabricated house of 100.00 sq.m. in Porto Rafti.
May 27, 2024
Construction of a ground floor FlexyHome house 70.00 sq.m. in Messinia.
May 21, 2024
Construction of a ground floor Prefab house 200.00 sq.m. in Lagonisi.
May 16, 2024
Construction parts of a ground floor prefabricated house were delivered to our commercial partner Zentili Michalis with an area of 118.75 m2 for construction in Limassol, Cyprus.
May 09, 2024
Construction of a two-storey prefabricated house 328.70 sq.m. in New Eritrea
April 26, 2024
Construction of a ground floor Prefab house 87.75 sq.m. to Gerakas.
