Construction Timeline

Apr 09, 2014
A ground floor house of stage 1 (unfinished) was handed over to our business partner Zentili Michalis with an area of 111 sq.m. for construction in Pano Arodes, Cyprus eco-label
Mar 10, 2014
The sale of the FlexyHome residence in Kardara, Tripoli, has been completed eco-label
Mar 10, 2014
The construction of the ground floor superstructure with a total area of 74 sq.m. was completed. in Lagonisi, Attica eco-label
Mar 10, 2014
The construction of a two-story house with a total area of 64 sq.m. was completed. in Salamina Attica eco-label
February 10, 2014
A ground-floor house of stage 1 (unfinished) was delivered to our commercial partner Tsirba Georgios with an area of 48 sq.m. for construction in Drama eco-label
Jan 13, 2014
The construction of a two-story house with a total area of 120 sq.m. was completed. in Pallini, Attica eco-label
Dec 24, 2013
A ground floor house of stage 1 (unfinished) with a total area of 80 sq.m was delivered in Chalkida eco-label
Dec 24, 2013
A ground-floor house of stage 1 (unfinished) was delivered to the commercial partner with an area of 50 sq.m. for construction in Chania eco-label
Dec 24, 2013
A two-storey stage 1 house (unfinished) was delivered to our commercial partner with an area of 135 sq.m. for construction in Chania eco-label
Dec 24, 2013
The construction of a ground-floor house with a total area of 65 sq.m. was completed. in Pastida Rhodes eco-label
November 15, 2013
The sale of the FlexyHome residence in Zygos Artas has been completed eco-label
November 12, 2013
The sale of the FlexyHome residence in Orea Eleni, Corinthia, has been completed eco-label