Construction Timeline

Sep 13, 2023
Construction of ground floor with attic of a prefabricated house of 118.63 sq.m. in Attali Chalkida eco-label
Sep 11, 2023
Construction of a ground floor Prefab house 115.00 sq.m. in Ioannina. eco-label
August 29, 2023
Construction of a two-storey prefabricated house 209.00 sq.m. in Kifissia. eco-label
Aug 07, 2023
Construction of a ground floor Prefab house 166.94 sq.m. in Kapandriti. eco-label
Aug 02, 2023
Construction of a ground floor Prefab house 98.00 sq.m. at the Red Mill. eco-label
Aug 01, 2023
Construction parts of a ground floor prefabricated house with an attic were delivered to our commercial partner Zentili Michalis with an area of 185.25 m2 for construction in Daryneia - Famagusta, Cyprus. eco-label
July 25, 2023
Construction of a two-storey prefabricated house 192.00 sq.m. in Menidi. eco-label
July 18, 2023
Construction of a ground floor Prefab house 79.00 sq.m. in Agiokampos of Evia. eco-label
June 30, 2023
Construction of ground floor with attic of a prefabricated house 89.67 sq.m. to Gerakas eco-label
June 26, 2023
Construction of a ground floor prefabricated house of 100.00 sq.m. to Hermione eco-label
June 19, 2023
Construction of a two-storey prefabricated house 129.44 sq.m. in Anavyssos. eco-label
June 14, 2023
Construction parts of a ground floor prefabricated house were delivered to our commercial partner Zentili Michalis with an area of 195.85 m2 for construction in Limassol, Cyprus. eco-label