Construction Timeline

Oct 20, 2014
Construction of a superstructure with a total area of 65 sq.m. in Ymmitos eco-label
Oct 20, 2014
Construction of a ground floor residence with a total area of 67 sq m in Lamia, Fthiotida eco-label
Oct 20, 2014
Construction of a ground floor residence with a total area of 24 sq m in Pallini eco-label
Oct 20, 2014
The sale of the Container BOX construction in Markopoulo, Attica, has been completed
Oct 20, 2014
Construction of a ground floor residence, stage 1, with a total area of 95 sq m. in Corinthia eco-label
Oct 20, 2014
Construction of a ground floor house with an attic of a total area of 88 sq m in Porto Rafti eco-label
Aug 13, 2014
Construction of a FlexyHome residence of 45 sq m (with installation of a thermal facade for external cladding) in Petritsia, Preveza eco-label
Aug 13, 2014
A ground floor residence of stage 1 (unfinished) was delivered to our commercial partner with an area of 42 sq m. for construction in Chania eco-label
Aug 13, 2014
A two-story house of stage 1 (unfinished) was delivered to our commercial partner with an area of 228 sq m. for construction in Chania eco-label
Aug 13, 2014
Construction of a ground floor house with an attic of a total area of 99 sq m in Koumani, Ilia eco-label
Aug 13, 2014
The construction of a two-story residence with a total area of 106 sq m in Arethousa, Ikaria, has been completed. eco-label
Aug 13, 2014
A ground floor residence of stage 1 (unfinished) was delivered to our commercial partner Zintilis Michalis, area 70 sq m. for construction in Limassol, Cyprus eco-label