Stages of Finnish delivery

KIT form: Do it yourself | Stage 1: Unfinished | Stage 2: Complete | |
---|---|---|---|
Architectural design | YES | YES | YES |
Transfer from Finland | YES | YES | YES |
Exterior Finnish non-stick masonry | YES | YES | YES |
Internal non-stick masonry | YES | YES | YES |
Wiring materials and accessories (depending on the type of house) | YES | YES | YES |
Insulating corner connection material | YES | YES | YES |
Self-adhesive waterproofing tape | YES | YES | YES |
Wooden reinforcement connecting wedges | YES | YES | YES |
Metal anchoring angles | YES | YES | YES |
Asphalt membrane at the base of the masonry | YES | YES | YES |
Residential windows | — | YES | YES |
Mezzanine beams | YES | YES | YES |
Roof | YES | YES | YES |
Waterproofing with asphalt membrane | — | YES | YES |
Skinning | — | YES | YES |
Remuneration (beams) of composite wood | — | YES | YES |
Swedish Benders cement tiles with 30 years written guarantee with resistance up to -50 ° C | — | YES | YES |
Laths-beams | — | YES | YES |
Insulation | — | YES | YES |
Insulation with optimal coefficient of thermal conductivity, to meet the requirements of KENAK | — | YES | YES |
Internal staircase of composite timber (where available) | — | YES | YES |
Frames and window finishes | — | YES | YES |
Slab contraction joints should intersect at the openings for columns | — | YES | YES |
Work supervision | — | YES | YES |
Cranes | — | YES | YES |
Installation works | — | YES | YES |
Electrical installations | — | YES | YES |
Hydraulic installations | — | YES | YES |
Τοποθέτηση πατωμάτων | — | — | YES |
House paints with Finnish paints | — | — | YES |
Room cabinets, kitchen cabinets | — | — | YES |
Interior doors | — | — | YES |
Sanitary ware in their entirety | — | — | YES |